Activities

  

Highways, roads and streets

Reconstruction of Montevideo Blvd. in Sofia

The project is funded by: Sofia Municipality
Budget: 9 522 058,17 BGN
Start date: 17 Dec 2015
End date: 01 Mar 2017
Employer: Sofia Municipality
Contractor: Trace Group Hold PLC

RECONSTRUCTION AND EXPANSION OF MONTEVIDEO“BLVD. IN SOFIA

  • FIRST PHASE:"PRESIDENTLINCOLN" BLVD. TO 763 STR.
  • SECOND PHASE763 STR. TO ДО “NIKOLA PETKOV” BLVD.

A complete reconstruction is about to be performed on “Montevideo” Blvd. in the section from “Nikola Petkov” Blvd. to 763 Str. The reconstruction includes the following types of construction works: road structures, drainage, sewerage, water - supply, electricity, street lighting, telephones, and new optical cables, reconstruction of existing fiber optic cables, gas supply and planting. Also traffic lights are going to be installed at intersections with part of the inter-neighborhood streets.

In the section from 763 Str. to the intersection of “President Lincoln” Blvd. a technical project is going to be designed and in the mentioned section is going to be placed new asphalt. The following construction works are envisaged: removal of existing defects on the pavement, asphalting, construction of new sidewalks, repair and restoration of street lighting.