"Reconstruction and expansion of sewage and water supply network in Samara 3 living area", Stara Zagora"
The total length of sewage network provided for construction in Stage I is 3,313.10 m, where the domestic sewage network is with length of 1,237.71 m, mixed sewage network is with length of 825.67 m and the rain collection sewage network is with length of 1,249.72 m. All adjoining building sewage joints and rain collecting flow-offs are provided for construction in this stage.
The total length of sewage network provided for construction in Stage II is 2,780.83 m, where the domestic sewage network is with length of 1,190.72 m, mixed sewage network is with length of 421.01 m and the rain collection sewage network is with length of 1,169.10 m. All adjoining building sewage joints and rain collecting flow-offs are provided for construction in this stage. Together with the implementation of Stage II of the sewage system, Stage II of the water supply network and the building pipe joints, supplying constructed properties will be constructed. The total length of the water supply network, provided to be constructed in the second stage is 953,40 m.
Contractor of the agreement is company, as per the obligations and contracts law "SAMARA 2015" with leading partner "Trace Group Hold" PLC and partner "DK INFRA" OOD.