Reconstruction of “Todor Kableshkov” Blvd. in Sofia, Bulgaria

Budget: 11 018 085.85 BGN with VAT
Start date: 12 May 2020
Employer: SOFIA MUNICIPALITY
Contractor: "TRACE GROUP HOLD" PLC

“Trace Group” works on the extension construction works on “Todor Kableshkov” Blvd. (in the section between “Bulgaria” Blvd. and “Lui Ayer” Str.), which is a key project to relieve the traffic in the southern districts of the Bulgarian capital. The construction process is divided into seven stages. The first stage starts from Mall Bulgaria and goes to “Boyanski Vodopad” Str. During the construction of the southern lane of the boulevard, the traffic in both directions on the northern lane will not be changed or restricted. Only in the fourth stage of the project there will be a change in the bus stops location in order not to hinder the construction process. The construction of water supply system, electricity and gas supply networks, telecommunications are up to be executed. The boulevard extension is designed on three levels so that there is shared traffic between cars, cyclists and pedestrians. A bike lane will be built between the road lane and the sidewalk. A tram route is also planned.