Parallel non-commercial road Bela Palanka – Pirot (west)

The project is funded by: European Bank for Reconstruction and Development
Budget: 15 364 223.83 euro
Start date: 08 Apr 2014
End date: 01 Dec 2016
Employer: Koridori Srbije Ltd., Belgrade, Republic of Serbia
Contractor: Trace Group Hold PLC

Construction of E80 Highway, Section: Parallel non-commercial road, Bella Palanka - Pirot (West), Project: Corridor 10 Highway

Short description of the project:

Construction project "Parallel non-commercial road, Bella Palanka - Pirot (West)" is with approximate length of 22 km and is spit into two sections, as a relevant section of the main highway route. The design speed is 60 km/h and safe clearance limit is 9 m.

Facilities:

Section 1:

1.       Bridge over Nishava River, L=257,05 m, total width: 237m

2.       Bridge over Bezimeni potok River, L=22.29m, total width: 10.70m

3.       2 slab-stone culverts, L=5m

4.       Revetment wall, L=285.59m

5.       10 pipe culverts, L=172,30; ᴓ800, ᴓ1000, ᴓ1400

Section 2:

1.       Bridge over Vraneshnitsa River, L=38.05m, total width: 10.70m

2.       Bridge over Petrova River, L=46.57 m, total width: 40m

3.       Bridge over Temska, L=75.05 m, total width: 63m

4.       2 slab-stone culverts, L=5m

5.       25 pipe culverts, L=375m; ᴓ600, ᴓ1000, ᴓ1600, ᴓ2000, ᴓ1800

6.       12 revetment walls, L=465m

Section 3:

1.       Overpass, L=90m, total width: 11m

2.       1 slab-stone culvert, L=12m

3.       10 pipe culverts, L=144.07m;ᴓ1000, ᴓ1600

4.       1 revetment wall, L=24m

Total volume of works:

1.       Trench – 411 436.74m3

2.       Embankment – 202 978.77m3

3.       Asphalt works – 338 353.55t

4.       Concrete works – 8 717.23m3