“Trace Group Hold” Plc began the third stage of the rehabilitation of “Bulgaria” Blvd. located in the section from “Gotse Delchev” Blvd. to “Todor Kableshkov” Blvd. in Sofia. The following road construction works are going to be executed: milling, installation of a „road mesh“ net, application of two layers of asphalt - binder and durable layer with polymer modified bitumen. The rehabilitation also includes waterproofing of the compromised underpasses, as well as a repair of a sidewalk by implementing а cycle path.
Video on rehabilitation of “Bulgaria” Blvd. in Sofia is available here.